BAU BANG PROJECT WITH OVER 1300 TONS OF STEEL STRUCTURES
-
03/05/2024
Seico - Superior capability, top quality
Seico is proud to be a reputable supplier of steel structures for the BW Bàu Bàng project in the expanded Bàu Bàng Industrial Park, Lai Uyên Town, Bàu Bàng District, Bình Dương Province. BW Bàu Bàng is one of the high-quality rental factories of BW Industrial in the Southern region. With over 1300 tons of steel structures provided, Seico has contributed to the construction of a modern project that optimally meets the production needs of businesses.
Photos of project
Quantity of materials Seico provided for the project
Seico has participated in the construction of a total of 4 factories, providing over 1300 tons of steel structures and beams, along with nearly 35,000m2 of roofing.
Photos of project
D3 and D4 factories:
- Seico provided 710 tons of steel structures and beams along with nearly 35,000m2 of roofing.
- The factory design is spacious and airy, optimally meeting production needs and ensuring high aesthetics.
C3 and C4 factories:
- Seico continues to affirm its construction capability with 590 tons of steel structures.
- Completed the BW Bàu Bàng project on time and according to technical requirements.
Seico - A reputable partner for every project
With a team of experienced engineers and workers, along with a modern system of equipment, Seico always ensures to provide customers with high-quality products that meet all technical requirements and construction progress. Contact Seico now for detailed advice and quotes!
Tin tức liên quan

- 14
- Apr
SEICO – COMMITMENT TO QUALITY & INTERNATIONAL STANDARDS
- 14/04/2026
In steel structures, welds serve as a critical “link” that directly determines the overall strength and safety of the entire structure. Regardless of how optimized the design is or how high-quality the materials are, inadequate welding can still pose significant technical risks during operation.
Xem thêm
- 10
- Apr
WHAT DOES PC1 AUSTRALIA SAY ABOUT SEICO?
- 10/04/2026
SEICO is honored to receive positive feedback from Mr. Geoff Grant, representative of PC1 Australia, following the collaboration on projects delivered to the Australian market.
Xem thêm
- 07
- Apr
Welding Quality Control – A Key Factor Determining the Reliability of Steel Structures
- 07/04/2026
In the steel structure industry, welds are considered the critical “linking element” that directly affects the strength and safety of the entire structure. No matter how accurate the design is or how high-quality the materials are, if the weld quality is not ensured, the structure will still pose potential risks during operation.
Xem thêm.jpg)
- 01
- Apr
SEICO Thailand Officially Launches Our Local Website
- 01/04/2026
SEICO JSC is proud to announce the official launch of its dedicated website for the Thai market: www.seico.co.th This marks a significant milestone in SEICO’s expansion journey across Southeast Asia. From now on, customers and partners in Thailand can easily access detailed information about our products and services through our official local platform.
Xem thêm(5).png)
- 20
- Mar
SEICO Accompanies Thai Tuan Group on a 470 Million USD Factory
- 20/03/2026
With a strong development orientation in the textile and garment sector, Thai Tuan Group has invested in the construction of a large-scale fabric manufacturing plant with a total investment of over 470 Million USD.
Xem thêm.png)
- 17
- Mar
Inside the factory project designed - manufactured - constructed by Seico
- 17/03/2026
SEICO Steel Structure is proud to present images from the interior of the factory project directly designed, manufactured, and fully constructed by SEICO. This project clearly demonstrates our comprehensive capabilities, synchronized processes, and the high technical standards that SEICO consistently commits to in every project.
Xem thêm
- 13
- Mar
SEICO’s Milestone in the Thailand Market
- 13/03/2026
The project in Thailand marks an important milestone in SEICO’s journey to expand its presence in international markets.
Xem thêm.png)
- 31
- Mar
LIGHT STEEL FRAME SOLUTION - OPTIMAL CHOICE FOR LIVESTOCK FARM PROJECTS
- 31/03/2026
Thanks to integrated design on specialized software and manufacturing with modern CNC machines, C and Z sections made from galvanized steel with thickness from 0.6 – 2.5mm are automatically produced with high precision. The resulting structure is strong yet features low material consumption per m².
Xem thêm
Vietnam
English
Japan
Korea
China
Indonesia
Thailand