EXPORT PROCESS – PROJECT OPERATION PROCEDURE AT SEICO STEEL STRUCTURE VIETNAM
-
16/06/2025
A solid structure begins with a solid process.
At Seico Steel Structure Vietnam, every project is a journey we take seriously – from the very first conversation to final handover and aftercare. Whether it's understanding your needs, proposing tailored solutions, or executing with precision, our team is committed to professionalism, transparency, and long-term partnership.
📊 The infographic below outlines our 7-step domestic operation process, designed to ensure each steel structure project is delivered on time, on budget, and built to last.
Planning a new facility or exploring structural steel solutions?
📞Contact SEICO now – our experts are ready to support you with the right strategy for your project.
Explore more sustainable and safe building solutions at seico.vn
Email: hnsales@seico.vn
Hotline: (+84) 24 2210 6611
Address: Level 4, Vimeco CT4 Building, Nguyen Chanh Street, Trung Hoa, Cau Giay, Hanoi
Tin tức liên quan

- 27
- Aug
SEICO SUPPORTS EMPLOYEES AFFECTED BY TYPHOON WIPHA
- 27/08/2025
In line with the directives of the higher-level Trade Union and the Company’s Leadership on caring for employees’ well-being, SEICO’s Trade Union promptly launched a support program to share difficulties with those whose homes and assets were directly damaged.
Xem thêm
- 15
- Aug
PROJECT UPDATE | SEICO ADVANCES WORKS AT AN PHAT COMPLEX
- 15/08/2025
At the Factory Project at An Phat High-Tech Industrial Park (An Phat Complex), our teams are hard at work transforming steel and drawings into structures that will soon support production lines, logistics operations, and industrial growth.
Xem thêm
- 07
- Aug
STANDARDIZING TO SOAR: SEICO EARNS FOUR PRETIGIOUS ISO CERTIFICATIONS
- 07/08/2025
We are proud to announce that SEICO has successfully completed the audit process and been awarded the ISO international management system certifications
Xem thêm.png)
- 01
- Aug
SEICO - CERTIFICATION AUDIT FOR ISO 9001 – 14001 – 45001 MANAGEMENT SYSTEMS
- 01/08/2025
Last week, SEICO successfully coordinated with an international certification body to carry out the initial certification audit of its integrated management systems
Xem thêm
- 29
- Jul
FROM BLUEPRINT TO REALITY – MOLEX IS TRANSFORMING DAY BY DAY
- 29/07/2025
In the heart of Hung Yen’s dynamic industrial zone, steel frames rise under the sun, while each panel comes together to form the outer skin of the Molex factory (Phase I) — a construction masterpiece gradually taking shape from the very first lines on paper.
Xem thêm
- 18
- Jul
APPLICATION OF SEAMLOCK ROOFING AND INTEGRATED CLADDING SOLUTIONS AT THE DOWHA PROJECT
- 18/07/2025
Cladding is more than just a protective layer for industrial buildings — it plays a critical role in improving operational efficiency, extending structural lifespan, and minimizing long-term maintenance costs.
Xem thêm
- 08
- Jul
PHUONG DONG-VAN DON PROJECT: SEICO MASTERING THE ENTIRE PROCESS FROM DESIGN TO INSTALLATION
- 08/07/2025
The Phuong Dong – Van Don Project stands as a prime example of SEICO’s comprehensive capabilities in executing non-standard steel structure projects.
Xem thêm
- 27
- Jun
ISO 3834-2 – AFFIRMING QUALITY MANAGEMENT EXCELLENCE AT SEICO STEEL STRUCTURE
- 27/06/2025
On June 17, 2025, SEICO Steel Structures was honored to host a team of experts at our facility for an official assessment under ISO 3834-2, an internationally recognized standard for quality management in welding processes.
Xem thêm