SEICO PARTNERS WITH DUC THINH NEW MATERIALS TECHNOLOGY: 2,000 TONS OF STEEL – 80,000 m² OF CLADDING
-
16/06/2025
Amidst the vast, green landscapes of Nghệ An, the construction site of the Đức Thịnh Stone Powder Plant stands out with its impressive scale and bustling construction pace. This is one of the key projects where SEICO is proud to contribute, taking on the responsibility of executing major structural components with substantial volume.
SEICO’s Scope of Work:
-
Steel structures & purlins: over 2,000 tons
-
Roofing and cladding sheets: approximately 80,000 m²

At the construction site, SEICO’s dedicated team works tirelessly, day and night, meticulously assembling each steel component and roofing sheet with precision, safety, and strict adherence to schedule.
Surrounded by clear skies, greenery, and serene lakes, the working atmosphere remains more energetic than ever. Every stage of the construction process reflects the seamless combination of quality, speed, and a strong sense of responsibility—the core values that SEICO is committed to delivering in every project.
Through this large-scale project, SEICO continues to affirm its construction capabilities and reputation, contributing sustainable value to both our clients and the community.

Contact SEICO – Trusted Expert in Steel Structure Solutions
With over 22 years of experience in steel structure design, fabrication, and construction, SEICO has successfully delivered hundreds of steel building projects across Vietnam and internationally. We provide innovative, high-quality steel construction solutions that meet strict technical standards and exceed aesthetic expectations.
If you are looking for a reliable steel construction company, contact SEICO today for a free consultation:
- 💎 SEICO STEEL
- 🌐 Website: http://seico.vn
- 📞 WhatsApp: (+84) 946 752 866
- ✉️ Email: hnsales@seico.vn
- 🌐 YouTube: SEICO JSC
- 🌐 LinkedIn: SEICO JSC on LinkedIn
👉 SEICO – Delivering sustainable, aesthetic, and efficient steel structure solutions for every project.
Tin tức liên quan

- 27
- Jan
UNDER-FILM CORROSION IN STEEL STRUCTURE - THE SILENT DESTROYER BENEATH PROTETIVE COATINGS
- 27/01/2026
In the steel structure industry, many believe that a visually flawless paint coating is enough to ensure proper steel protection.
Xem thêm
- 23
- Jan
SEICO IS PROUD TO PARTNER WITH THE HLI ECOHUB NAM HÀ PROJECT
- 23/01/2026
Seico is proud to provide steel structure solutions for the green and sustainable ready-built factory complex developed by Hoa Long Invest (HLI), designed in accordance with international LEED standards. The project integrates energy-efficient solutions and minimizes environmental impact.
Xem thêm.png)
- 07
- Jan
STEEL STRUCTURE PREPARATION - THE FOUNDATION FOR SUSTAINABLE STEEL STRUCTURE SOLUTIONS
- 07/01/2026
In steel structure fabrication, proper surface preparation prior to coating is a critical process that directly affects the quality and durability of the structure. Steel surfaces often contain dust, grease, rust, or mill scale; if not thoroughly removed, these contaminants significantly reduce coating adhesion, leading to premature peeling and early corrosion.
Xem thêm.png)
- 30
- Dec
SEICO X OUTDOOR EQUIPMENT MANUFACTURING FACTORY PROJECT – HAI PHONG
- 30/12/2025
The Outdoor Equipment Manufacturing Factory Project in Hai Phong is being developed on a modern scale, meeting high requirements in functionality, construction schedule, and quality. Accompanying the project, SEICO continues to affirm its capabilities and reputation by delivering steel structure solutions for industrial factory buildings.
Xem thêm.png)
- 18
- Dec
- 18/12/2025
At Cai Lan Industrial Park, Ha Long City, Quang Ninh Province – a key industrial hub in Northern Vietnam – the Steel Structure Manufacturing and High-Tech Equipment Fabrication Plant is being developed with large scale and stringent technical requirements. In this project, SEICO is responsible for the supply and erection of steel structures and industrial cladding systems, contributing significantly to the overall structural integrity and architectural appearance of the facility.
Xem thêm.png)
- 10
- Dec
DISCOVER THE MOST STUNNING CURVED STEEL ROOF IN VAN DON
- 10/12/2025
The Phuong Dong Van Don Entertainment Complex is one of the most architecturally distinctive developments in Van Don, Quang Ninh. Beyond its impressive scale, the project sets exceptionally demanding requirements for “non-standard” steel structures: large spans, elegantly curved geometry, complex spatial trusses, and near-perfect aesthetic standards.
Xem thêm.png)
- 06
- Dec
SEICO’S PROUD MILESTONE IN NGHE AN – DUC THINH NEW MATERIALS
- 06/12/2025
With continuous dedication, the SEICO team is actively executing and gradually completing the Đức Thịnh New Materials stone manufacturing plant located in the Nghĩa Đàn Industrial Park, Nghe An Province.
Xem thêm
Vietnam
English
Japan
Korea
China
Indonesia
Thailand
