SUPER LIGHT GAUGE STEEL STRUCTURE - OPTIMAL SOLUTION FOR PIG FARMS
-
10/11/2023
Seico is honored to be the supplier of lightweight steel structures and roofing for the ✨High-Tech Pig Farm - GREENTECH✨ project in Hai Ha, Quang Ninh.

This is a large-scale farm with a total area of up to 70,000m2 and 22 standard pig pens, featuring:
⭐ HIGH PRECISION with modern technology: The project is designed 100% using specialized software for lightweight structures and manufactured 100% with CNC cutting machines.
⭐ COST-EFFICIENT and high durability.
⭐ TIME-EFFICIENT: Accelerating the construction progress to complete the frame structure and roofing astonishingly fast, taking only 07 days/house.




👉 With these advantages, the light gauge structure model is a worthy and optimal choice for advanced livestock farms. Seico takes pride in its experience in farm projects, offering customers superior solutions in terms of cost, structure, installation efforts, and the efficiency of advanced farm operations.
📞 Contact us now for the quickest consultation and quotation!
Tin tức liên quan

- 27
- Jan
UNDER-FILM CORROSION IN STEEL STRUCTURE - THE SILENT DESTROYER BENEATH PROTECTIVE COATINGS
- 27/01/2026
In the steel structure industry, many believe that a visually flawless paint coating is enough to ensure proper steel protection.
Xem thêm
- 23
- Jan
SEICO IS PROUD TO PARTNER WITH THE HLI ECOHUB NAM HA PROJECT
- 23/01/2026
Seico is proud to provide steel structure solutions for the green and sustainable ready-built factory complex developed by Hoa Long Invest (HLI), designed in accordance with international LEED standards. The project integrates energy-efficient solutions and minimizes environmental impact.
Xem thêm.png)
- 07
- Jan
STEEL STRUCTURE PREPARATION - THE FOUNDATION FOR SUSTAINABLE STEEL STRUCTURE SOLUTIONS
- 07/01/2026
In steel structure fabrication, proper surface preparation prior to coating is a critical process that directly affects the quality and durability of the structure. Steel surfaces often contain dust, grease, rust, or mill scale; if not thoroughly removed, these contaminants significantly reduce coating adhesion, leading to premature peeling and early corrosion.
Xem thêm.png)
- 30
- Dec
SEICO X OUTDOOR EQUIPMENT MANUFACTURING FACTORY PROJECT – HAI PHONG
- 30/12/2025
The Outdoor Equipment Manufacturing Factory Project in Hai Phong is being developed on a modern scale, meeting high requirements in functionality, construction schedule, and quality. Accompanying the project, SEICO continues to affirm its capabilities and reputation by delivering steel structure solutions for industrial factory buildings.
Xem thêm.png)
- 18
- Dec
- 18/12/2025
At Cai Lan Industrial Park, Ha Long City, Quang Ninh Province – a key industrial hub in Northern Vietnam – the Steel Structure Manufacturing and High-Tech Equipment Fabrication Plant is being developed with large scale and stringent technical requirements. In this project, SEICO is responsible for the supply and erection of steel structures and industrial cladding systems, contributing significantly to the overall structural integrity and architectural appearance of the facility.
Xem thêm.png)
- 10
- Dec
DISCOVER THE MOST STUNNING CURVED STEEL ROOF IN VAN DON
- 10/12/2025
The Phuong Dong Van Don Entertainment Complex is one of the most architecturally distinctive developments in Van Don, Quang Ninh. Beyond its impressive scale, the project sets exceptionally demanding requirements for “non-standard” steel structures: large spans, elegantly curved geometry, complex spatial trusses, and near-perfect aesthetic standards.
Xem thêm.png)
- 06
- Dec
SEICO’S PROUD MILESTONE IN NGHE AN – DUC THINH NEW MATERIALS
- 06/12/2025
With continuous dedication, the SEICO team is actively executing and gradually completing the Đức Thịnh New Materials stone manufacturing plant located in the Nghĩa Đàn Industrial Park, Nghe An Province.
Xem thêm
Vietnam
English
Japan
Korea
China
Indonesia
Thailand