APPLICATION OF SEAMLOCK ROOFING AND INTEGRATED CLADDING SOLUTIONS AT THE DOWHA PROJECT
-
18/07/2025
Cladding is more than just a protective layer for industrial buildings — it plays a critical role in improving operational efficiency, extending structural lifespan, and minimizing long-term maintenance costs.
At the Dowha Project in Quang Binh, SEICO is implementing a fully integrated cladding system that meets rigorous technical requirements while also emphasizing architectural aesthetics and long-term durability:
12,600 m² of fire-resistant Seamlock roofing with reflective insulation
The Seamlock roofing system is ideal for large-scale structures requiring high durability. Designed without the use of exposed fasteners, it offers superior water resistance and eliminates the risks of leakage and corrosion commonly found at screw penetrations. Additionally, its construction reduces thermal expansion and enhances insulation performance, thanks to the integrated reflective fire-resistant insulation layer.

530 m² of translucent roof panels (skylight system)
These panels provide natural lighting and ventilation, helping reduce energy consumption while improving the indoor working environment.

Insect screens and rain-resistant flashings
All complementary components are installed with precision and consistency, ensuring airtight integration at every material junction. This prevents insect intrusion and protects against wind-driven rain.

As a full-service provider — from design and materials to installation — SEICO delivers international-standard integrated cladding solutions that simultaneously meet technical performance, functional utility, and architectural design criteria.
The Dowha project stands as a notable example of SEICO’s commitment to comprehensive, high-performance solutions in the field of steel structures.
SEICO STEEL
Website: http://seico.vn
Email: hnsales@seico.vn
YouTube: www.youtube.com/@SEICOJSC
LinkedIn: SEICO JSC trên LinkedIn
SEICO – Engineering sustainable, aesthetic, and efficient steel structure solutions for every project.
Tin tức liên quan
.png)
- 06
- Dec
SEICO’S PROUD MILESTONE IN NGHE AN – DUC THINH NEW MATERIALS
- 06/12/2025
With continuous dedication, the SEICO team is actively executing and gradually completing the Đức Thịnh New Materials stone manufacturing plant located in the Nghĩa Đàn Industrial Park, Nghe An Province.
Xem thêm
- 02
- Dec
- 02/12/2025
At SEICO, quality is not only defined by the final product — it is built through a transparent, precise, and professional end-to-end process.
Xem thêm.png)
- 21
- Nov
SEICO CONDUCTS QR CODE LABELING TRAINING & PRACTICE – READY TO IMPLEMENT THE PAE MANAGEMENT SYSTEM
- 21/11/2025
To enhance transparency, traceability, and management efficiency throughout the entire lifecycle of steel components, SEICO organized a QR code labeling training and hands-on practice session at the Factory.
Xem thêm.png)
- 14
- Nov
SEICO STEEL STRUCTURE TO PAKISTAN: EXPANDING BEYOND BORDERS
- 14/11/2025
From SEICO’s manufacturing facility in Vietnam, high-quality steel components continue to be packaged, exported, and delivered for the Hangar project in Pakistan.
Xem thêm.png)
- 07
- Nov
HOA THANH FACTORY – A NEW MILESTONE FOR SEICO IN THANH HOA
- 07/11/2025
Another significant milestone in SEICO’s journey to conquer large-scale industrial projects.
Xem thêm.jpeg)
- 29
- Oct
GROUNDBREAKING CEREMONY - THAI TUAN TEXTILE PRODUCT FINISHING FACTORY
- 29/10/2025
On October 22, 2025, the groundbreaking ceremony of the Thai Tuan Textile Product Finishing Factory took place successfully at Duc Lap III Industrial Park, Tay Ninh Province.
Xem thêm(1).png)
- 23
- Oct
SEICO – THE MARK OF STEEL STRUCTURES ACROSS VIETNAM
- 23/10/2025
Across the North, Central, and South of Vietnam, SEICO’s presence continues to expand with pride and precision. Our team has just marked another milestone at Hoa Cam Industrial Park – Cam Le District – Da Nang City, with the PT Da Nang Project now taking shape.
Xem thêm.png)
- 23
- Oct
SEICO ACCOMPANIES LONG GOLD HAI PHONG PROJECT
- 23/10/2025
Every project begins with strong and reliable steel frames. On the construction site today, SEICO’s team is diligently assembling each component and every precise joint to build the “skeleton” of a large-scale project.
Xem thêm
Vietnam
English
Japan
Korea
China
Indonesia
Thailand