APPLICATION OF SEAMLOCK ROOFING AND INTEGRATED CLADDING SOLUTIONS AT THE DOWHA PROJECT
-
18/07/2025
Cladding is more than just a protective layer for industrial buildings — it plays a critical role in improving operational efficiency, extending structural lifespan, and minimizing long-term maintenance costs.
At the Dowha Project in Quang Binh, SEICO is implementing a fully integrated cladding system that meets rigorous technical requirements while also emphasizing architectural aesthetics and long-term durability:
12,600 m² of fire-resistant Seamlock roofing with reflective insulation
The Seamlock roofing system is ideal for large-scale structures requiring high durability. Designed without the use of exposed fasteners, it offers superior water resistance and eliminates the risks of leakage and corrosion commonly found at screw penetrations. Additionally, its construction reduces thermal expansion and enhances insulation performance, thanks to the integrated reflective fire-resistant insulation layer.

530 m² of translucent roof panels (skylight system)
These panels provide natural lighting and ventilation, helping reduce energy consumption while improving the indoor working environment.

Insect screens and rain-resistant flashings
All complementary components are installed with precision and consistency, ensuring airtight integration at every material junction. This prevents insect intrusion and protects against wind-driven rain.

As a full-service provider — from design and materials to installation — SEICO delivers international-standard integrated cladding solutions that simultaneously meet technical performance, functional utility, and architectural design criteria.
The Dowha project stands as a notable example of SEICO’s commitment to comprehensive, high-performance solutions in the field of steel structures.
SEICO STEEL
Website: http://seico.vn
Email: hnsales@seico.vn
YouTube: www.youtube.com/@SEICOJSC
LinkedIn: SEICO JSC trên LinkedIn
SEICO – Engineering sustainable, aesthetic, and efficient steel structure solutions for every project.
Tin tức liên quan
(1).png)
- 23
- Oct
SEICO – THE MARK OF STEEL STRUCTURES ACROSS VIETNAM
- 23/10/2025
Across the North, Central, and South of Vietnam, SEICO’s presence continues to expand with pride and precision. Our team has just marked another milestone at Hoa Cam Industrial Park – Cam Le District – Da Nang City, with the PT Da Nang Project now taking shape.
Xem thêm.png)
- 23
- Oct
SEICO ACCOMPANIES LONG GOLD HAI PHONG PROJECT
- 23/10/2025
Every project begins with strong and reliable steel frames. On the construction site today, SEICO’s team is diligently assembling each component and every precise joint to build the “skeleton” of a large-scale project.
Xem thêm
- 23
- Oct
FROM BLUEPRINT TO REALITY – MOLEX IS TRANSFORMING DAY BY DAY
- 23/10/2025
In the heart of Hung Yen’s dynamic industrial zone, steel frames rise under the sun, while each panel comes together to form the outer skin of the Molex factory (Phase I) — a construction masterpiece gradually taking shape from the very first lines on paper.
Xem thêm
- 23
- Oct
PROJECT UPDATE | SEICO ADVANCES WORKS AT AN PHAT COMPLEX
- 23/10/2025
At the Factory Project at An Phat High-Tech Industrial Park (An Phat Complex), our teams are hard at work transforming steel and drawings into structures that will soon support production lines, logistics operations, and industrial growth.
Xem thêm
- 29
- Sep
SEICO JOINS HANDS WITH PROJECT IN HUNG YEN
- 29/09/2025
Another project is being executed with the spirit of “precise structures – on-time delivery – lasting quality”:
Xem thêm
- 03
- Oct
SEICO TAKES PROACTIVE ACTION IN STORM PREVENTION & RESPONSE AT CONSTRUCTION SITES
- 03/10/2025
In recent days, tropical storms have formed and caused damage across many tropical countries, including Vietnam. During the storm season, Seico always prioritizes prevention, preparedness, and safety assurance at all construction sites and projects.
Xem thêm.png)
- 23
- Sep
SEICO COMPLETES BAC GIANG LOGISTIC PARK 2 PROJECT
- 23/09/2025
SEICO is proud to have partnered with Bac Giang Logistic Park 2 Co., Ltd. in completing a modern logistics facility in Hiep Hoa, Bac Giang.
Xem thêm.png)
- 08
- Sep
TEAM BUILDING 2025 – SHINING TOGETHER IN UNITY
- 08/09/2025
Continuing the theme of SEICO’s 22nd anniversary – “Excellence & Unity”, this summer Seicoers embarked on a true Team Building journey: as dazzling as fireworks, and as united as national spirit.
Xem thêm
Vietnam
English
Japan
Korea
China
Indonesia
Thailand