DISCOVER THE NEW GENERATION LIVESTOCK FARM CONSTRUCTION SOLUTION
-
12/12/2024
Why should you choose a lightweight steel building solution for your farm?
In the context of modern agriculture, building modern and sustainable livestock farms is extremely important. Seico's lightweight steel building solution has become a trend, the optimal choice for high-tech barns due to the following outstanding advantages:
- Fast construction speed: lightweight steel building are super light, 30 - 50% lighter than traditional pre-engineered steel buildings with the same layout, size and function. By using cold-stamped thin-walled components, transportation and installation are easy and quick.
High-tech livestock farm model
- Cost savings: lightweight steel building can reduce foundation costs thanks to their light weight while still ensuring load-bearing capacity.
- High durability: lightweight steel can withstand weather and environmental impacts, ensuring durability for the farm.
Seico lightweight steel building solution - The perfect choice for your farm
With many years of experience in the field of steel structure construction, Seico is proud to bring customers the most optimal lightweight steel building solution. We provide a full range of services, from design, production to installation, ensuring to meet all customer requirements.
Cold-formed thin-walled steel with high galvanization for farm construction
- Professional design: Seico's team of experienced engineers will advise and design factory and barn projects that meet the investor's requirements.
- High quality: Using high-quality steel, combined with modern production technology, ensures durability and safety for the project.
- Easy maintenance: The components of the lightweight steel building are designed to be easy to disassemble, convenient for repair and maintenance.
- The lightweight steel used for farm construction is designed according to design standards such as:
+ Load and impact standards
+ Load standards
+ Cold-formed thin-walled bar design standards
- The roof slope is designed to be greater than 10%, the span is less than or equal to <30m depending on functional requirements.
- When building a lightweight steel building, Seico uses high-strength materials to provide long-term durability. The material often uses high-plated XG blanks to withstand chemical corrosion caused by barn waste.
- In addition, lightweight steel construction can significantly accelerate the construction progress of completing the frame structure and roofing: only 20 days/standard livestock house.
Application of Seico lightweight steel building in livestock farming
- Livestock farms: Cows, pigs, chickens...
- Warehouse for food and supplies.
- Auxiliary works: pumping station, water tank...
Why choose Seico?
- Experience: With many years of operation in the construction field, Seico has successfully implemented thousands of projects.
- Reputation: We always put the quality of the project first, ensuring the right progress and budget.
- Professional service: Enthusiastic consulting team, 24/7 customer support.
Let Seico accompany you to build a modern, efficient and sustainable farm!
Tin tức liên quan
.png)
- 18
- Dec
- 18/12/2025
At Cai Lan Industrial Park, Ha Long City, Quang Ninh Province – a key industrial hub in Northern Vietnam – the Steel Structure Manufacturing and High-Tech Equipment Fabrication Plant is being developed with large scale and stringent technical requirements. In this project, SEICO is responsible for the supply and erection of steel structures and industrial cladding systems, contributing significantly to the overall structural integrity and architectural appearance of the facility.
Xem thêm.png)
- 10
- Dec
DISCOVER THE MOST STUNNING CURVED STEEL ROOF IN VAN DON
- 10/12/2025
The Phuong Dong Van Don Entertainment Complex is one of the most architecturally distinctive developments in Van Don, Quang Ninh. Beyond its impressive scale, the project sets exceptionally demanding requirements for “non-standard” steel structures: large spans, elegantly curved geometry, complex spatial trusses, and near-perfect aesthetic standards.
Xem thêm.png)
- 06
- Dec
SEICO’S PROUD MILESTONE IN NGHE AN – DUC THINH NEW MATERIALS
- 06/12/2025
With continuous dedication, the SEICO team is actively executing and gradually completing the Đức Thịnh New Materials stone manufacturing plant located in the Nghĩa Đàn Industrial Park, Nghe An Province.
Xem thêm
- 02
- Dec
- 02/12/2025
At SEICO, quality is not only defined by the final product — it is built through a transparent, precise, and professional end-to-end process.
Xem thêm.png)
- 21
- Nov
SEICO CONDUCTS QR CODE LABELING TRAINING & PRACTICE – READY TO IMPLEMENT THE PAE MANAGEMENT SYSTEM
- 21/11/2025
To enhance transparency, traceability, and management efficiency throughout the entire lifecycle of steel components, SEICO organized a QR code labeling training and hands-on practice session at the Factory.
Xem thêm.png)
- 14
- Nov
SEICO STEEL STRUCTURE TO PAKISTAN: EXPANDING BEYOND BORDERS
- 14/11/2025
From SEICO’s manufacturing facility in Vietnam, high-quality steel components continue to be packaged, exported, and delivered for the Hangar project in Pakistan.
Xem thêm.png)
- 07
- Nov
HOA THANH FACTORY – A NEW MILESTONE FOR SEICO IN THANH HOA
- 07/11/2025
Another significant milestone in SEICO’s journey to conquer large-scale industrial projects.
Xem thêm.jpeg)
- 28
- Oct
GROUNDBREAKING CEREMONY - THAI TUAN TEXTILE PRODUCT FINISHING FACTORY
- 28/10/2025
On October 22, 2025, the groundbreaking ceremony of the Thai Tuan Textile Product Finishing Factory took place successfully at Duc Lap III Industrial Park, Tay Ninh Province.
Xem thêm
Vietnam
English
Japan
Korea
China
Indonesia
Thailand