FROM BLUEPRINT TO REALITY – MOLEX IS TRANSFORMING DAY BY DAY
-
29/07/2025
In the heart of Hung Yen’s dynamic industrial zone, steel frames rise under the sun, while each panel comes together to form the outer skin of the Molex factory (Phase I) — a construction masterpiece gradually taking shape from the very first lines on paper.
📍 The 8,000m² site is no longer an empty plot — it has become a stage where over 600 tons of steel structures and purlins, 8,500m² of roofing sheets, 8,800m² of deck flooring, and 3,000m² of insulated wall panels are being assembled with millimeter-level precision.
Every beam, every joint is part of a “symphony” composed by structural professionals.
And SEICO — like a silent director — is telling a story through steel, through speed, and through precision.
SEICO STEEL
Website: http://seico.vn
Email: hnsales@seico.vn
YouTube: www.youtube.com/@SEICOJSC
LinkedIn: SEICO JSC trên LinkedIn
SEICO – Engineering sustainable, aesthetic, and efficient steel structure solutions for every project.
Tin tức liên quan

- 27
- Aug
SEICO SUPPORTS EMPLOYEES AFFECTED BY TYPHOON WIPHA
- 27/08/2025
In line with the directives of the higher-level Trade Union and the Company’s Leadership on caring for employees’ well-being, SEICO’s Trade Union promptly launched a support program to share difficulties with those whose homes and assets were directly damaged.
Xem thêm
- 15
- Aug
PROJECT UPDATE | SEICO ADVANCES WORKS AT AN PHAT COMPLEX
- 15/08/2025
At the Factory Project at An Phat High-Tech Industrial Park (An Phat Complex), our teams are hard at work transforming steel and drawings into structures that will soon support production lines, logistics operations, and industrial growth.
Xem thêm
- 07
- Aug
STANDARDIZING TO SOAR: SEICO EARNS FOUR PRETIGIOUS ISO CERTIFICATIONS
- 07/08/2025
We are proud to announce that SEICO has successfully completed the audit process and been awarded the ISO international management system certifications
Xem thêm.png)
- 01
- Aug
SEICO - CERTIFICATION AUDIT FOR ISO 9001 – 14001 – 45001 MANAGEMENT SYSTEMS
- 01/08/2025
Last week, SEICO successfully coordinated with an international certification body to carry out the initial certification audit of its integrated management systems
Xem thêm
- 18
- Jul
APPLICATION OF SEAMLOCK ROOFING AND INTEGRATED CLADDING SOLUTIONS AT THE DOWHA PROJECT
- 18/07/2025
Cladding is more than just a protective layer for industrial buildings — it plays a critical role in improving operational efficiency, extending structural lifespan, and minimizing long-term maintenance costs.
Xem thêm
- 08
- Jul
PHUONG DONG-VAN DON PROJECT: SEICO MASTERING THE ENTIRE PROCESS FROM DESIGN TO INSTALLATION
- 08/07/2025
The Phuong Dong – Van Don Project stands as a prime example of SEICO’s comprehensive capabilities in executing non-standard steel structure projects.
Xem thêm
- 27
- Jun
ISO 3834-2 – AFFIRMING QUALITY MANAGEMENT EXCELLENCE AT SEICO STEEL STRUCTURE
- 27/06/2025
On June 17, 2025, SEICO Steel Structures was honored to host a team of experts at our facility for an official assessment under ISO 3834-2, an internationally recognized standard for quality management in welding processes.
Xem thêm
- 16
- Jun
EXPORT PROCESS – PROJECT OPERATION PROCEDURE AT SEICO STEEL STRUCTURE VIETNAM
- 16/06/2025
Explore the export process of Seico Steel Structure Vietnam – from initial contact to post-project warranty. We’re dedicated to delivering optimal steel structure solutions and building lasting partnerships with clients worldwide.
Xem thêm