Optimizing Factory Construction Schedules with SEICO’s Steel Structure Solutions
-
07/07/2026
SEICO is honored to be selected by Taisan Vietnam Co., Ltd. as the trusted partner to provide an integrated construction solution for the Taisan Vietnam Factory Project at VSIP Quang Ngai Industrial Park.
Covering a total area of 73,405.25 m², the project is designed to support the manufacturing and processing of furniture products, sports equipment, and semi-finished metal and plastic components, serving both domestic and export markets.

SEICO partners with the Taisan Vietnam Factory Project at VSIP Quang Ngai Industrial Park.
Within the project scope, SEICO is responsible for providing:
- Steel structures
- Steel deck flooring system
- Protective coating systems for steel structures
By delivering these integrated solutions, SEICO helps streamline the design, manufacturing, and construction processes while ensuring consistent quality throughout the entire project.
Pre-Engineered Steel Buildings – An Effective Solution for Accelerating Industrial Construction
The erection progress on site clearly demonstrates one of the key advantages of pre-engineered steel buildings (PEBs): rapid construction and efficient schedule control.
Unlike conventional construction methods, steel components are precisely fabricated in the factory while foundation works are carried out simultaneously on site. This parallel workflow significantly improves project efficiency. Once the foundation is completed, the steel components can be transported directly to the site for immediate erection, substantially reducing the overall construction timeline.

SEICO provides an integrated solution package, including steel structures, steel deck systems, and protective coating systems for the project.
This approach offers several benefits to project owners:
- Accelerated construction schedules
- Reduced waiting time between construction activities
- Shorter overall project completion time
- Earlier commencement of production operations
- Greater flexibility in investment and business planning
Fast Construction Requires Quality and Precision
Construction speed can only deliver its full value when a project is optimized from the design and manufacturing stages.
To minimize potential issues during installation, the structural system must be carefully engineered to ensure structural performance, cost efficiency, and constructability. At the same time, fabrication processes must strictly comply with technical standards to guarantee the accuracy of every component before delivery and erection.

An integrated solution approach helps accelerate project execution and streamline construction progress.
The seamless integration of design, manufacturing, and construction is the key factor that enables a project to achieve both fast-track execution and long-term quality performance.
SEICO – Your Integrated Solution Partner for Industrial Projects
With comprehensive capabilities covering steel structures, steel deck systems, and industrial protective coatings, SEICO continues to support investors in developing modern industrial facilities that maximize construction efficiency and enhance investment value.

SEICO continues to partner with investors in delivering high-quality industrial facilities, optimizing construction schedules and maximizing investment efficiency.
The Taisan Vietnam Factory Project at VSIP Quang Ngai Industrial Park stands as another testament to SEICO’s commitment to delivering high-quality construction solutions that meet the increasingly demanding requirements of both domestic and international industrial manufacturing projects.
SEICO - True steel - Complete Trust
-------------------
SEICO STEEL
Website: http://seico.vn
Email: hnsales@seico.vn
YouTube: www.youtube.com/@SEICOJSC
LinkedIn: SEICO JSC trên LinkedIn
Tin tức liên quan

- 04
- Aug
Mascot Project in Gia Lai Vietnam officially commences
- 04/08/2026
SEICO has officially commenced the structural steel and protective coating package for the Mascot Vietnam Gia Lai Factory, a large-scale foreign direct investment (FDI) project in Vietnam’s Central Highlands region.
Xem thêm
- 30
- Jul
6 Key Criteria For Selecting A Steel Structure Contractor
- 30/07/2026
In any project, the steel structure forms the foundation that determines the quality, schedule, and investment efficiency of the entire building. For this reason, the selection of a contractor must be evaluated based on execution capability, management systems, and the ability to partner throughout the full project lifecycle.
Xem thêm- 29
- Jul
Technical Insight: Modern Textile Manufacturing Facilities
- 29/07/2026
SEICO has participated in the development of multiple facilities within Thai Tuan Group’s integrated textile, dyeing, and garment manufacturing system. With more than 30 years of growth and industry leadership, Thai Tuan is recognized as one of Vietnam’s leading textile brands. Through these projects, SEICO has gained a deep understanding of the key requirements for textile manufacturing facilities:
Xem thêm
- 17
- Jul
CORE 5 Quang Ninh - When Logistics Requires More Than A Conventional Warehouse
- 17/07/2026
The CORE5 Quang Ninh project stands as a testament to SEICO’s capability in partnering with investors and developers to deliver modern logistics centers, enhancing supply chain efficiency and supporting the evolving growth demands of the market in the years ahead.
Xem thêm
- 14
- Jul
- 14/07/2026
SEICO has successfully completed the fabrication and erection of structural steel works for a large-scale project, delivering more than 4,000 tons of structural steel and 40,000 m² of SP Deck flooring within an ambitious three-month schedule.
Xem thêm- 01
- Jul
SEICO Mid-Year Review Conference: First-half Business Results and Second-half 2026 Objectives
- 01/07/2026
On the morning of June 27, 2026, SEICO's Board of Directors, together with department managers, deputy managers, and key personnel, gathered for the Mid-Year Review Conference to assess business performance during the first six months of the year and align on objectives and action plans for the remainder of 2026.
Xem thêm
- 23
- Jun
FDI surges ahead, driving the need for more integrated industrial infrastructures solutions
- 23/06/2026
Vietnam continues to strengthen its position as one of the region’s most attractive destinations for foreign direct investment (FDI). During the first four months of 2026, total registered FDI exceeded USD 18.2 billion, representing a 32% increase compared to the same period last year.
Xem thêm.png)
- 24
- Jun
The Rainy and Storm Season is Approaching - Is Your Facility Ready?
- 24/06/2026
Every year, heavy rainfall, strong winds, flooding, and landslides significantly impact the operations of factories and industrial facilities across the country.
Xem thêm
Vietnam
English
Japan
Korea
China
Indonesia
Thailand