PHUONG DONG-VAN DON PROJECT: SEICO MASTERING THE ENTIRE PROCESS FROM DESIGN TO INSTALLATION
-
08/07/2025
The Phuong Dong – Van Don Project stands as a prime example of SEICO’s comprehensive capabilities in executing non-standard steel structure projects. This is not just a large-scale development—it is also uniquely challenging due to its coastal location, where harsh weather, strong winds, and high salinity create tough conditions for any contractor.
Tailor-Made Steel Structures – Tackling Complex Engineering
With its non-standard design, each structural component is custom-engineered with meticulous precision. SEICO addressed the project's technical complexities right from the design phase. Using Tekla Structures 3D modeling software, the team generated highly accurate shop drawings directly from the model, significantly reducing errors during onsite construction.
Every element was thoroughly calculated to optimize structural strength while ensuring safety and efficiency under the harsh coastal environment—with strong winds and high humidity.
Tailor-Made Steel Structures – Tackling Complex Engineering
Proactive Planning – Seamless Execution
One of the project's major challenges was the transportation and erection of oversized structural members. SEICO proactively developed an optimized erection plan using a synchronized set of solutions:
- Deployment of specialized cranes (50–100 tons) in combination with boom lifts
- Careful planning of crane paths, working zones, and anchoring points
- Onsite operation streamlined for safety, accuracy, and cost-effectiveness
Using specialized cranes (50–100 tons)
Strict Quality Control – Absolute Precision
Going beyond standard design and construction, SEICO also engaged an independent inspection agency to conduct on-site verification of component dimensions and surface flatness. Every technical parameter was rigorously checked to ensure maximum safety and precision for the entire structure.
SEICO hired an independent inspection agency to conduct on-site verification
SEICO JSC – Your Trusted Partner in Steel Structure
With full in-house capabilities in design, fabrication, and erection, SEICO delivers safe, optimized, and high-quality structural steel solutions—especially for complex, large-scale, or coastal projects requiring technical excellence.
💎 SEICO STEEL
🌐 Website: http://seico.vn
📞 WhatsApp: (+84) 946 752 866
✉️ Email: hnsales@seico.vn
🌐 YouTube: www.youtube.com/@SEICOJSC
🌐 LinkedIn: SEICO JSC trên LinkedIn
Tin tức liên quan

- 05
- Jul
SPREADING KINDNESS THROUGH SEICO'S ENGAGEMENT FUND
- 05/07/2025
Seico’s Trade Union Engagement Fund have been awarded to outstanding individuals.
Xem thêm
- 27
- Jun
ISO 3834-2 – AFFIRMING QUALITY MANAGEMENT EXCELLENCE AT SEICO STEEL STRUCTURE
- 27/06/2025
On June 17, 2025, SEICO Steel Structures was honored to host a team of experts at our facility for an official assessment under ISO 3834-2, an internationally recognized standard for quality management in welding processes.
Xem thêm
- 16
- Jun
EXPORT PROCESS – PROJECT OPERATION PROCEDURE AT SEICO STEEL STRUCTURE VIETNAM
- 16/06/2025
Explore the export process of Seico Steel Structure Vietnam – from initial contact to post-project warranty. We’re dedicated to delivering optimal steel structure solutions and building lasting partnerships with clients worldwide.
Xem thêm
- 16
- Jun
SEICO PARTNERS WITH DUC THINH NEW MATERIALS TECHNOLOGY: 2,000 TONS OF STEEL – 80,000 m² OF CLADDING
- 16/06/2025
SEICO undertakes the steel structure and roofing works for Đức Thịnh Stone Powder Plant in Nghệ An, with a scale of over 2,000 tons of steel and 80,000 m² of cladding. Committed to quality, on-time delivery, and a strong sense of responsibility.
Xem thêm
- 08
- Mar
HAPPY INTERNATIONAL WOMEN'S DAY
- 08/03/2025
On the occasion of International Women's Day March 8th, Seico sends the best wishes to half of the world! Wishing mothers, sisters, and all women to always be beautiful, radiant, full of happiness, and successful in all fields.
Xem thêm
- 21
- Apr
THE TRENDING OF REPLACING FORM DECK BY SPEED DECK
- 21/04/2022
Being one of the pioneers in the production of reinforced floor slab truss deck (SP Deck) in Vietnam. We provide industrial floor slabs including rib-form-zinc-plate metal sheets, welded on the top to an empty girder with round bar steel, triangular cross-section.
Xem thêm
- 26
- Sep
SP DECK'S JUST HAD SUCH A SUCCESSFUL EXHIBITION AT VIETBUILD
- 26/09/2022
Last week, Vietbuild International Construction Exhibition 2022 took place in Ha Noi. There, SP DECK was exhibited
Xem thêm
- 19
- Apr
SEICO ERECTS STEEL STRUCTURES FOR THE MESSER PROJECT
- 19/04/2024
One of the many steel structure projects Seico is currently working on is the Messer Industrial Gas Plant project.
Xem thêm