PHUONG DONG-VAN DON PROJECT: SEICO MASTERING THE ENTIRE PROCESS FROM DESIGN TO INSTALLATION
-
08/07/2025
The Phuong Dong – Van Don Project stands as a prime example of SEICO’s comprehensive capabilities in executing non-standard steel structure projects. This is not just a large-scale development—it is also uniquely challenging due to its coastal location, where harsh weather, strong winds, and high salinity create tough conditions for any contractor.
Tailor-Made Steel Structures – Tackling Complex Engineering
With its non-standard design, each structural component is custom-engineered with meticulous precision. SEICO addressed the project's technical complexities right from the design phase. Using Tekla Structures 3D modeling software, the team generated highly accurate shop drawings directly from the model, significantly reducing errors during onsite construction.
Every element was thoroughly calculated to optimize structural strength while ensuring safety and efficiency under the harsh coastal environment—with strong winds and high humidity.
Tailor-Made Steel Structures – Tackling Complex Engineering
Proactive Planning – Seamless Execution
One of the project's major challenges was the transportation and erection of oversized structural members. SEICO proactively developed an optimized erection plan using a synchronized set of solutions:
- Deployment of specialized cranes (50–100 tons) in combination with boom lifts
- Careful planning of crane paths, working zones, and anchoring points
- Onsite operation streamlined for safety, accuracy, and cost-effectiveness
Using specialized cranes (50–100 tons)
Strict Quality Control – Absolute Precision
Going beyond standard design and construction, SEICO also engaged an independent inspection agency to conduct on-site verification of component dimensions and surface flatness. Every technical parameter was rigorously checked to ensure maximum safety and precision for the entire structure.
SEICO hired an independent inspection agency to conduct on-site verification
SEICO JSC – Your Trusted Partner in Steel Structure
With full in-house capabilities in design, fabrication, and erection, SEICO delivers safe, optimized, and high-quality structural steel solutions—especially for complex, large-scale, or coastal projects requiring technical excellence.
💎 SEICO STEEL
🌐 Website: http://seico.vn
📞 WhatsApp: (+84) 946 752 866
✉️ Email: hnsales@seico.vn
🌐 YouTube: www.youtube.com/@SEICOJSC
🌐 LinkedIn: SEICO JSC trên LinkedIn
Tin tức liên quan

- 27
- Jan
UNDER-FILM CORROSION IN STEEL STRUCTURE - THE SILENT DESTROYER BENEATH PROTETIVE COATINGS
- 27/01/2026
In the steel structure industry, many believe that a visually flawless paint coating is enough to ensure proper steel protection.
Xem thêm
- 23
- Jan
SEICO IS PROUD TO PARTNER WITH THE HLI ECOHUB NAM HÀ PROJECT
- 23/01/2026
Seico is proud to provide steel structure solutions for the green and sustainable ready-built factory complex developed by Hoa Long Invest (HLI), designed in accordance with international LEED standards. The project integrates energy-efficient solutions and minimizes environmental impact.
Xem thêm.png)
- 07
- Jan
STEEL STRUCTURE PREPARATION - THE FOUNDATION FOR SUSTAINABLE STEEL STRUCTURE SOLUTIONS
- 07/01/2026
In steel structure fabrication, proper surface preparation prior to coating is a critical process that directly affects the quality and durability of the structure. Steel surfaces often contain dust, grease, rust, or mill scale; if not thoroughly removed, these contaminants significantly reduce coating adhesion, leading to premature peeling and early corrosion.
Xem thêm.png)
- 30
- Dec
SEICO X OUTDOOR EQUIPMENT MANUFACTURING FACTORY PROJECT – HAI PHONG
- 30/12/2025
The Outdoor Equipment Manufacturing Factory Project in Hai Phong is being developed on a modern scale, meeting high requirements in functionality, construction schedule, and quality. Accompanying the project, SEICO continues to affirm its capabilities and reputation by delivering steel structure solutions for industrial factory buildings.
Xem thêm.png)
- 18
- Dec
- 18/12/2025
At Cai Lan Industrial Park, Ha Long City, Quang Ninh Province – a key industrial hub in Northern Vietnam – the Steel Structure Manufacturing and High-Tech Equipment Fabrication Plant is being developed with large scale and stringent technical requirements. In this project, SEICO is responsible for the supply and erection of steel structures and industrial cladding systems, contributing significantly to the overall structural integrity and architectural appearance of the facility.
Xem thêm.png)
- 10
- Dec
DISCOVER THE MOST STUNNING CURVED STEEL ROOF IN VAN DON
- 10/12/2025
The Phuong Dong Van Don Entertainment Complex is one of the most architecturally distinctive developments in Van Don, Quang Ninh. Beyond its impressive scale, the project sets exceptionally demanding requirements for “non-standard” steel structures: large spans, elegantly curved geometry, complex spatial trusses, and near-perfect aesthetic standards.
Xem thêm.png)
- 06
- Dec
SEICO’S PROUD MILESTONE IN NGHE AN – DUC THINH NEW MATERIALS
- 06/12/2025
With continuous dedication, the SEICO team is actively executing and gradually completing the Đức Thịnh New Materials stone manufacturing plant located in the Nghĩa Đàn Industrial Park, Nghe An Province.
Xem thêm
Vietnam
English
Japan
Korea
China
Indonesia
Thailand
