AURORA IP WASTEWATER TREATMENT PLANT: OPTIMIZING OPERATIONS WITH A COMPREHENSIVE SOLUTION FROM SEICO
-
15/05/2026
The Wastewater Treatment Plant project at the Rang Dong Textile Industrial Park – Aurora IP has been planned with a total treatment capacity of up to 110,000 m³ per day, developed through multiple modern treatment modules to meet sustainable operational demands and increasingly strict environmental standards.
In its newly completed phase, the project stands out with an operation building featuring a unique “eggshell-shaped” steel roof system. The design reflects a modern architectural language, creating a striking highlight for the entire wastewater treatment complex while also requiring a high level of coordination between structural systems, materials, and technical solutions.
As a project partner, SEICO provided a comprehensive solution package including:
- Steel structures
- SP Deck flooring system
- Roofing sheet system with specially designed wave profiles

SP Deck flooring system optimized for construction progress
The “giant funnel-mouth” architecture is not only an aesthetic statement but also the result of a fully optimized process between design intent and practical construction solutions. Implementing the project under a combo solution model helped synchronize all components from the beginning, ensuring technical compatibility and optimizing the project’s operational efficiency.

Seamless integration between structural systems, materials, and technical solutions
Beyond the technical aspects, SEICO’s integrated solution also provided significant advantages for the investor in project management. Instead of coordinating with multiple separate contractors, the investor could manage all related work packages through a single focal point. This approach helped:
- Optimize investment costs
- Shorten coordination and implementation time
- Minimize overlapping responsibilities between parties
- Synchronize project schedule, technical standards, and construction quality
- Centralize legal and operational responsibilities under one clear point of accountability
.png)
Roofing sheet system with specially designed wave profiles
Rather than simply supplying products, SEICO positions itself as a solution partner, accompanying investors in creating efficient, sustainable, and long-term optimized projects.
The Rang Dong – Aurora IP Wastewater Treatment Plant project continues to demonstrate this direction: integrating engineering, architecture, and comprehensive solutions to create practical value for modern industrial facilities.
SEICO - True Steel - Complete Trust
-------------------
SEICO STEEL
Website: http://seico.vn
Email: hnsales@seico.vn
YouTube: www.youtube.com/@SEICOJSC
LinkedIn: SEICO JSC trên LinkedIn
Tin tức liên quan

- 14
- May
CASE STUDY: REDUCING TOTAL STEEL STRUCTURE WEIGHT BY 20% THROUGH DESIGN OPTIMIZATION
- 14/05/2026
In high-tech agricultural projects, the challenge is not only about “designing a structure that is safe enough,” but also about optimizing investment costs, construction efficiency, and long-term operational performance.
Xem thêm(7).png)
- 08
- May
SEICO x Core5 Hai Phong – Phase 2 at Nam Dinh Vu Industrial Park
- 08/05/2026
Progress update on the structural steel package at the Core5 Hai Phong project – one of the modern, sustainability-oriented industrial developments at Nam Dinh Vu Industrial Park.
Xem thêm
- 30
- Apr
Molex Project - Seico's mark in the high-tech industry
- 30/04/2026
Seico is proud to partner with the Molex Project—part of Koch Industries—through Molex Vietnam. This is a flagship project in the high-tech sector, focusing on the production of high-speed connectivity cables, multi-core cables, and fiber optic modules
Xem thêm
- 27
- Apr
Concordia International School – A Mark of SEICO’s Steel Structure Solutions
- 27/04/2026
Concordia International School Hanoi, recognized as one of the most prestigious international educational institutions in Hanoi, stands as a representative project showcasing SEICO’s capabilities in delivering complex steel structure solutions that require advanced technical expertise and precise coordination among all stakeholders.
Xem thêm
- 24
- Apr
Seico Steel Structure & A Distinctive Architectural Landmark in Bacolod, Philippines
- 24/04/2026
In the heart of Bacolod City, Philippines, The Bacolod Philippines Temple of The Church of Jesus Christ of Latter-day Saints stands out as a distinctive architectural landmark with profound religious significance. The project is a clear testament to the fusion of modern architectural language and the unique identity of the “Land of a Thousand Islands,” brought to life through advanced steel structure solutions.
Xem thêm
- 14
- Apr
SEICO – COMMITMENT TO QUALITY & INTERNATIONAL STANDARDS
- 14/04/2026
In steel structures, welds serve as a critical “link” that directly determines the overall strength and safety of the entire structure. Regardless of how optimized the design is or how high-quality the materials are, inadequate welding can still pose significant technical risks during operation.
Xem thêm
- 10
- Apr
WHAT DOES PC1 AUSTRALIA SAY ABOUT SEICO?
- 10/04/2026
SEICO is honored to receive positive feedback from Mr. Geoff Grant, representative of PC1 Australia, following the collaboration on projects delivered to the Australian market.
Xem thêm
- 07
- Apr
Welding Quality Control – A Key Factor Determining the Reliability of Steel Structures
- 07/04/2026
In the steel structure industry, welds are considered the critical “linking element” that directly affects the strength and safety of the entire structure. No matter how accurate the design is or how high-quality the materials are, if the weld quality is not ensured, the structure will still pose potential risks during operation.
Xem thêm
Vietnam
English
Japan
Korea
China
Indonesia
Thailand