The Rainy and Storm Season is Approaching - Is Your Facility Ready?
-
24/06/2026
Every year, heavy rainfall, strong winds, flooding, and landslides significantly impact the operations of factories and industrial facilities across the country.
However, most incidents during the rainy and storm season are not caused by a single heavy downpour or an unusually severe storm. Rather, they often stem from existing vulnerabilities within the facility that have not been identified and addressed in time.
1. For Operating Factories and Industrial Buildings
Before the rainy and storm season begins, facility owners should proactively conduct a comprehensive assessment of their buildings, particularly the components most exposed to rainwater and wind loads:
- Inspect the roofing system, gutters, downpipes, and the overall drainage capacity of the facility.
- Review the condition of roofing sheets, ridge caps, connection details, and potential leakage-prone areas.
- Assess the corrosion status of steel structures, the condition of protective coating systems, and areas frequently exposed to moisture.
- Check for signs of deformation, excessive deflection, or localized damage within the roof structure and primary load-bearing members.
- Evaluate potential risks associated with flooding, erosion, or site-specific topographical conditions surrounding the facility.
Inspect the overall drainage capacity of the facility.
The resilience of a building against extreme weather conditions depends not only on maintenance practices but also on the quality of its original design and engineering solutions.
Critical factors such as wind loads, roof slope, drainage design, connection details, roofing materials, steel structural systems, and corrosion protection solutions must be carefully integrated from the outset. A single inadequately designed component can lead to water ponding, leakage, accelerated corrosion, or reduced service life during operation.
In practice, many failures occurring during the rainy and storm season are not solely weather-related. They often result from steel structures, roofing systems, accessories, and protective solutions that were not designed and implemented as part of a coordinated and integrated engineering approach.
In industrial construction, a sustainable facility is not only one that meets structural design requirements but also one that can maintain safe, stable, and efficient operation under actual environmental and climatic conditions.

Roof collapse after prolonged heavy rainfall – a result of inadequate integration between architectural design and structural engineering.
2. For Projects Under Construction
The rainy and storm season also presents significant risks to construction activities if appropriate preventive measures are not implemented.
The following actions should be prioritized:
- Clean and maintain temporary drainage systems throughout the construction site.
- Reinforce areas vulnerable to erosion or landslides using appropriate measures such as sandbags, gabions, or temporary retaining systems.
- Prioritize the completion of construction activities that are most susceptible to weather-related impacts to minimize project risks.
- Inspect and strengthen temporary bracing, anchoring, and support systems to ensure the stability of structures and equipment on site.
- Develop emergency response plans and material protection strategies in preparation for severe weather events and storm warnings.
Before the rainy season, businesses should proactively inspect and assess the overall condition of their facilities.
The rainy and storm season serves as a real-world test of a facility's design quality, construction standards, and maintenance practices. Thorough preparation today is the key to ensuring safe, reliable, and sustainable operations in the years ahead.
SEICO - True Steel - Complete Trust
-------------------
SEICO STEEL
Website: http://seico.vn
Email: hnsales@seico.vn
YouTube: www.youtube.com/@SEICOJSC
LinkedIn: SEICO JSC trên LinkedIn
Tin tức liên quan

- 23
- Jun
FDI surges ahead, driving the need for more integrated industrial infrastructures solutions
- 23/06/2026
Vietnam continues to strengthen its position as one of the region’s most attractive destinations for foreign direct investment (FDI). During the first four months of 2026, total registered FDI exceeded USD 18.2 billion, representing a 32% increase compared to the same period last year.
Xem thêm
- 19
- Jun
A New USD 25 Million FDI Project Takes Shape with SEICO's Integrated Solutions
- 19/06/2026
SEICO continues to strengthen its presence in the industrial construction sector by being selected as a trusted partner for a large-scale FDI project at VSIP Quang Ngai Industrial Park.
Xem thêm
- 17
- Jun
Duc Thinh New Materials Factory - SEICO’s Integrated Solution For High-Corrosion Environments
- 17/06/2026
Located in Nghe An Province, the Duc Thinh New Materials Factory operates in an environment with high concentrations of calcium dust. This is a common characteristic of the stone powder manufacturing industry and can significantly accelerate corrosion of steel structures and roofing systems if the facility is not properly designed and protected from the outset.
Xem thêm.png)
- 13
- Jun
- 13/06/2026
Koch Industries, the second-largest privately held company in the United States, generates approximately USD 125 billion in annual revenue. Within its ecosystem, Molex is one of the world's leading manufacturers of electronic connectivity solutions, cable assemblies, and high-speed data transmission infrastructure.
Xem thêm(1).png)
- 12
- Jun
SP Deck - Built for performance, designed for flexibility
- 12/06/2026
SP Deck (Truss Deck) is designed to work seamlessly with a wide range of structural systems, making it an ideal flooring solution for industrial, commercial, and logistics developments.
Xem thêm
- 06
- Jun
- 06/06/2026
On May 30, 2026, Biboy World Water Park, located within Phuong Dong Wonder Island Urban Area in Van Don, Quang Ninh Province, officially welcomed its first visitors, marking the beginning of an exciting summer season.
Xem thêm
- 02
- Jun
SEICO Receives Positive Customer Evaluation Letter from Duc Thinh New Material Technology Co., Ltd.
- 02/06/2026
Customer satisfaction has always been the most important measure of SEICO’s service quality and project execution capability. Recently, SEICO was honored to receive an evaluation letter from Duc Thinh New Material Technology Co., Ltd., recognizing the efforts and achievements delivered by the SEICO team throughout the project implementation process.
Xem thêm
- 26
- May
- 26/05/2026
In steel structures factory, the biggest challenge for floor systems is not only load-bearing capacity, but also vibration stability, long-span capability, and construction optimization. This is exactly why SP Deck technology was developed — representing a major advancement beyond traditional deck slab systems.
Xem thêm
Vietnam
English
Japan
Korea
China
Indonesia
Thailand