SEICO ACCOMPANIES LONG GOLD HAI PHONG PROJECT
-
22/10/2025
Every project begins with strong and reliable steel frames.
On the construction site today, SEICO’s team is diligently assembling each component and every precise joint to build the “skeleton” of a large-scale project.

The Long Gold Hai Phong project includes:
- 1,200 tons of structural steel
- 200 tons of purlins
- 25,000 m² of roofing sheets
- 14,800 m² of steel deck flooring
.png)
These impressive figures not only highlight the scale of the project but also affirm SEICO’s execution capability in accompanying key developments.
Stay tuned for the completed look of this project – where durable steel is given a “new coat” and transformed into a modern production and business space.
✨ SEICO – Shaping the future with steel! ✨
-------------------
SEICO STEEL
Website: http://seico.vn
Email: hnsales@seico.vn
YouTube: www.youtube.com/@SEICOJSC
LinkedIn: SEICO JSC trên LinkedIn
Tin tức liên quan
(5).png)
- 20
- Mar
SEICO Accompanies Thai Tuan Group on a 470 Million USD Factory
- 20/03/2026
With a strong development orientation in the textile and garment sector, Thai Tuan Group has invested in the construction of a large-scale fabric manufacturing plant with a total investment of over 470 Million USD.
Xem thêm.png)
- 17
- Mar
Inside the factory project designed - manufactured - constructed by Seico
- 17/03/2026
SEICO Steel Structure is proud to present images from the interior of the factory project directly designed, manufactured, and fully constructed by SEICO. This project clearly demonstrates our comprehensive capabilities, synchronized processes, and the high technical standards that SEICO consistently commits to in every project.
Xem thêm
- 13
- Mar
SEICO’s Milestone in the Thailand Market
- 13/03/2026
The project in Thailand marks an important milestone in SEICO’s journey to expand its presence in international markets.
Xem thêm.png)
- 07
- Mar
LIGHT STEEL FRAME SOLUTION - OPTIMAL CHOICE FOR LIVESTOCK FARM PROJECTS
- 07/03/2026
Thanks to integrated design on specialized software and manufacturing with modern CNC machines, C and Z sections made from galvanized steel with thickness from 0.6 – 2.5mm are automatically produced with high precision. The resulting structure is strong yet features low material consumption per m².
Xem thêm
- 08
- Mar
Happy International Women’s Day – March 8
- 08/03/2026
March 8 is a special occasion to honor the beauty, strength, and remarkable contributions of women in every aspect of life.
Xem thêm
- 03
- Mar
SEICO: GROUNDBREAKING CEREMONY FOR READY-BUILT FACTORY AND WAREHOUSE PROJECT IN HAI PHONG
- 03/03/2026
On February 26, 2026, Seico held the groundbreaking ceremony for the ready-built factory and warehouse for lease project at Lot CN2B, Nam Dinh Vu Industrial Park (Zone 2), Dong Hai 2 Ward, Hai An District, Hai Phong City.
Xem thêm
- 27
- Feb
- 27/02/2026
Amid the vibrant and joyful atmosphere of the first days of the Lunar New Year, Seico’s offices and factories simultaneously held spring opening celebrations and launch ceremonies filled with energy and determination.
Xem thêm(2).png)
- 27
- Feb
From the Seico's plant to a project in Sydney
- 27/02/2026
These UB steel sections have just been completed and are ready for their journey to Australia – a market where projects come with highly stringent technical standards for materials, fabrication, and surface protection.
Xem thêm
Vietnam
English
Japan
Korea
China
Indonesia
Thailand