SEICO TAKES PROACTIVE ACTION IN STORM PREVENTION & RESPONSE AT CONSTRUCTION SITES
-
03/10/2025
In recent days, tropical storms have formed and caused damage across many tropical countries, including Vietnam. During the storm season, Seico always prioritizes prevention, preparedness, and safety assurance at all construction sites and projects.
3 Proactive Steps Before a Storm
- Reinforce & inspect roof and steel frames: tighten bolts, check roof sheets and drainage systems to avoid roof damage or flooding.
- Protect materials & equipment: cover, secure, and move lightweight items to safe areas.
- Establish an emergency plan: prepare evacuation procedures, assign clear tasks, and ensure communication channels remain effective.
.png)
Reinforce & inspect roof and steel frames

Protect materials & equipment
5 Safety Measures During Storm Season
- Equip full protective gear: helmets, boots, reflective raincoats, anti-slip gloves.
- Cut off electricity when necessary: check electrical systems to prevent leakage or short circuits.
- Mark & restrict dangerous zones: stop working at height, place warning signs for strong winds and slippery conditions.
- Ensure site drainage: regularly clean gutters and drains to prevent flooding.
- Inspect after storms: evaluate impacts, repair and reinforce promptly.
.png)
Regularly clean gutters and drains to prevent flooding
With thorough preparation, Seico projects remain safe and resilient against natural disasters.
-------------------
SEICO STEEL
Website: http://seico.vn
Email: hnsales@seico.vn
YouTube: www.youtube.com/@SEICOJSC
LinkedIn: SEICO JSC trên LinkedIn
Tin tức liên quan

- 15
- May
AURORA IP WASTEWATER TREATMENT PLANT: OPTIMIZING OPERATIONS WITH A COMPREHENSIVE SOLUTION FROM SEICO
- 15/05/2026
The Wastewater Treatment Plant project at the Rang Dong Textile Industrial Park – Aurora IP has been planned with a total treatment capacity of up to 110,000 m³ per day, developed through multiple modern treatment modules to meet sustainable operational demands and increasingly strict environmental standards.
Xem thêm
- 14
- May
CASE STUDY: REDUCING TOTAL STEEL STRUCTURE WEIGHT BY 20% THROUGH DESIGN OPTIMIZATION
- 14/05/2026
In high-tech agricultural projects, the challenge is not only about “designing a structure that is safe enough,” but also about optimizing investment costs, construction efficiency, and long-term operational performance.
Xem thêm(7).png)
- 08
- May
SEICO x Core5 Hai Phong – Phase 2 at Nam Dinh Vu Industrial Park
- 08/05/2026
Progress update on the structural steel package at the Core5 Hai Phong project – one of the modern, sustainability-oriented industrial developments at Nam Dinh Vu Industrial Park.
Xem thêm
- 30
- Apr
Molex Project - Seico's mark in the high-tech industry
- 30/04/2026
Seico is proud to partner with the Molex Project—part of Koch Industries—through Molex Vietnam. This is a flagship project in the high-tech sector, focusing on the production of high-speed connectivity cables, multi-core cables, and fiber optic modules
Xem thêm
- 27
- Apr
Concordia International School – A Mark of SEICO’s Steel Structure Solutions
- 27/04/2026
Concordia International School Hanoi, recognized as one of the most prestigious international educational institutions in Hanoi, stands as a representative project showcasing SEICO’s capabilities in delivering complex steel structure solutions that require advanced technical expertise and precise coordination among all stakeholders.
Xem thêm
- 24
- Apr
Seico Steel Structure & A Distinctive Architectural Landmark in Bacolod, Philippines
- 24/04/2026
In the heart of Bacolod City, Philippines, The Bacolod Philippines Temple of The Church of Jesus Christ of Latter-day Saints stands out as a distinctive architectural landmark with profound religious significance. The project is a clear testament to the fusion of modern architectural language and the unique identity of the “Land of a Thousand Islands,” brought to life through advanced steel structure solutions.
Xem thêm
- 14
- Apr
SEICO – COMMITMENT TO QUALITY & INTERNATIONAL STANDARDS
- 14/04/2026
In steel structures, welds serve as a critical “link” that directly determines the overall strength and safety of the entire structure. Regardless of how optimized the design is or how high-quality the materials are, inadequate welding can still pose significant technical risks during operation.
Xem thêm
- 10
- Apr
WHAT DOES PC1 AUSTRALIA SAY ABOUT SEICO?
- 10/04/2026
SEICO is honored to receive positive feedback from Mr. Geoff Grant, representative of PC1 Australia, following the collaboration on projects delivered to the Australian market.
Xem thêm
Vietnam
English
Japan
Korea
China
Indonesia
Thailand